Determining The Most Comprehensive Method of Material’s Handling For Fabricated Ship’s Blocks
Abstract
References
Lawrence L Bethel, Production Control,
McGraw-Hill University of Michigan, 1948.
www.ijseat.com Page 723
International Journal of Science Engineering and Advance
Technology, IJSEAT, Vol. 4, Issue 12
Harold T. Amrine, Manufacturing
Organization and Management, Prentice Hall
– University of Michigan, 1993.
Franklin G Moore, Production / Operation
Management, R D Irwin, University of
Wisconsin – Madison, 1973.
Wikipedia, Material Handling, The free
Encyclopedia, 2016.
Richard L Storch, Ship Production
(
Second
edition
)
, publisher, Cornell maritime press,
centreville, MD 1995.
Barabanov, Ship Building Technology, Mir
Publisher, Rusia, 1986
Raymond A Kulwiec, Material Handling
Handbook, American Society of Mechanical
Engineers
(
ASME
)
, 1985.
Ioannou, G. & Kritikos, M.N. Optimization
of material handling in production and
warehousing facilities, European Journal of
Operational Research September
, 4:317
http://link.springer.com/article/10.1007/BF
Jaganathan, J. K, Solution To Large Facility
Layout Problems Using Group Technology.
Thesis. India, 2007.
http:
//soar.wichita.edu/dspace/bitstream/10057/11
/1/t07022
Gan Shu San, Didik Wahjudi, Analisa Tata
Letak Pabrik untuk Meminimalisasi Material
ISSN 2321-6905
December -2016
Handling pada Pabrik Koper, JURNAL
TEKNIK MESIN Vol. 2, No. 1, April 2000 :
– 49
http://puslit.petra.ac.id/journal/mechanical/
Unknown, Material Handling Procedure,
Jurong Shipyard, Pte Ltd Singapore
(
updated
)
,
Unknown, Safety Handbook in Material
Handling, PT. Karimun Sembawang
Shipyard
(
updated
)
, 2016.
Refbacks
- There are currently no refbacks.
Copyright © 2013, All rights reserved.| ijseat.com
International Journal of Science Engineering and Advance Technology is licensed under a Creative Commons Attribution 3.0 Unported License.Based on a work at IJSEat , Permissions beyond the scope of this license may be available at http://creativecommons.org/licenses/by/3.0/deed.en_GB.
Â